Reimagined Construction
Design-build renovation
Design-build renovation
Whole-home remodels, kitchens, bathrooms and additions in existing houses — planned, designed and built by one team, in Houston and the neighborhoods around it.
Whole-home renovation, 1924 bungalow — Houston Heights
We work on houses that are already standing and usually still occupied. That means the job starts with discovery rather than a blank site: what is behind the plaster, what the structure will allow, what the city will permit, and what it costs before anyone commits.
Our projects involve design, permitting, structural work and the coordination of a dozen trades over several months. We are not the right firm for a single fixture or a weekend repair, and saying so early saves everyone a conversation.
Recent work
Original footprint kept, everything inside it rebuilt. New structure at the rear where a previous addition had been carried on nothing much at all.
A load-bearing wall removed and carried on a flush beam, so the ceiling reads as one plane rather than announcing where the wall used to be.
Foundation assessed and reinforced before anything went up. The new floor sits inside the original roofline rather than perched above it.
Every room, the systems behind them, and usually the structure too.
Layout, structure and services — not a cabinet swap.
Bathroom Remodeling
Waterproofing done properly, because the failures are invisible for years.
New square footage that reads as though it was always there.
Design-Build
One team from first sketch to final walkthrough, one line of accountability.
Architect-Led Construction
You have a design team. We price it honestly and build it.
How it runs
01
Inquiry — A walkthrough and an honest range. We say early if the scope and the budget do not meet.
02
Discovery — We find out what the house actually is, including what is behind the finishes.
03
Design — Drawings and selections, priced as they develop rather than at the end.
04
Preconstruction — Estimate, permits, schedule and contract. This is where the price stops moving.
05
Construction — Protection first, then the work, with next week's schedule published every Friday.
06
Handover — Punch list closed before final payment, then two years of warranty.
Six phases, each with its own decisions and its own answer to the question everyone actually asks — is the price still moving?
18
Years renovating existing homes
240
Projects completed
14
Trade partners, average 9 years with us
100%
Licensed, bonded and insured
Living through it
Renovating an occupied home is a different discipline from building an empty one. We seal and negative-pressure the work area, protect floors and routes daily, keep one bathroom and one kitchen function running wherever the scope allows, and publish the week's schedule every Friday so nobody is surprised by a demolition day. The house is returned to a habitable state every evening, not at the end of the project.
They told us in the second week that the wall we wanted removed was carrying the roof, what it would cost to carry it properly, and what it would cost to leave it. Nobody else gave us a number that early, and the number did not move.
Houston and the neighborhoods around it. Most of our work is inside the Loop, in houses old enough to have opinions about being changed.
Our projects typically start around $150,000 and run through to whole-home work. If that matches what you have in mind, the first step is a short conversation and a walkthrough — no charge, no obligation.