Tile is the easy bit. What decides whether a bathroom is still sound in fifteen years is what happens behind it, and that is the work nobody photographs.
A shower opened to the studs, membrane not yet set
Design, drawings and a full selections schedule.
Demolition back to structure, and repair of whatever is found there.
Full waterproofing system, installed as a system rather than as products.
Plumbing and electrical alterations, permitted and inspected.
Tiling, joinery, glazing, fittings and decoration.
Mechanical ventilation that vents outside the building.
A bathroom is a waterproofing job with tile on top. Membrane, pre-slope, drain assembly, corners and penetrations all have to be one continuous system by one manufacturer, installed to that manufacturer's detail — mixing brands voids every warranty involved and is the most common failure we are called to fix.
We flood-test every shower pan before tiling and photograph it. It costs a day and it is the cheapest insurance on the job.
Bathrooms in older Houston houses have usually leaked slowly for years. Rotten subfloor, corroded supply lines, and joists notched through by a previous plumber are all normal findings rather than surprises.
We assume some remediation and carry it as a named allowance, so finding it is a scheduled event rather than a difficult conversation.
An extractor that terminates in a roof void is not ventilation; it is a way of moving the moisture problem somewhere you cannot see it. Every bathroom we do vents to outside air with a fan sized to the room.
How long it takes
Four to eight weeks on site
Plus six to twelve weeks of design and preconstruction. Tile and fittings are ordered before the start date; a bathroom waiting on a tile delivery is a bathroom you cannot use.
A bathroom we take on generally lands between $45,000 and $140,000. Below that it is a refit rather than a renovation, and a specialist will serve you better than we will.
Subfloor, joists and supply lines. Carried as an allowance because it is normal, not exceptional.
A full system to one manufacturer's detail, flood-tested and recorded.
Driven by material, format and pattern. Large-format and book-matched stone are labour, not just material.
Frameless glass to a stone threshold costs several times a standard enclosure.
Cheap in a pier-and-beam house, expensive through a slab.
Discovery
We open the wet wall and find out what has been happening behind it.
Design
Layout, drainage positions and every selection.
Preconstruction
Estimate, permit, tile and fittings ordered, schedule fixed.
Construction
Four to eight weeks, with a flood test before any tile goes down.
Handover
Punch list, warranty, and the flood-test record in your close-out pack.
If it is the only bathroom, this is genuinely disruptive and we will say so before you sign. Four to eight weeks without a bathroom is not something to discover in week two.
Where there is a second bathroom, most clients stay comfortably. The work area is sealed, and water is only off for short scheduled periods.
Dust from tile cutting is the worst of any room we work in. Cutting happens outside wherever the weather allows.
A walkthrough, an honest range, and a straight answer about what is likely behind the tile.