Reimagined Construction
Design-build renovation
What we do
Most kitchens people are unhappy with are not badly finished. They are badly shaped — closed off from the rest of the house, or laid out around a wall nobody has questioned in forty years.
The wall that turned out to be carrying, opened up
Design, drawings and a full selections schedule.
Structural work, including beams and the posts that carry them.
Electrical, plumbing and mechanical alterations, permitted and inspected.
Cabinetry, worktops, tiling, flooring and decoration.
Appliance installation and commissioning.
Protection of the rest of the house, and a temporary kitchen where the scope allows.
The wall between a Houston kitchen and the room behind it is load-bearing more often than not. Removing it means a beam, and a beam means posts, and posts mean something underneath them — which on a slab can mean a new pad footing.
This is the single largest fork in a kitchen budget. We price the flush-beam version and the dropped-bulkhead version side by side, because one costs roughly twice the other and only you can decide whether a continuous ceiling is worth it.
Kitchens concentrate more services than any other room. New circuits, often a new panel, gas relocation, waste and supply reroutes, and mechanical ventilation that actually vents outside rather than into a soffit.
In houses built before about 1970 we assume the electrical needs replacing rather than extending, and we say so in discovery rather than finding it at rough-in.
Cabinetry is the long-lead item and the one that sets the schedule. Ordering it late is the most common reason a kitchen runs over, so selections close in preconstruction, not during the build.
How long it takes
Six to fourteen weeks on site
Plus eight to sixteen weeks of design and preconstruction before anyone arrives. Cabinetry lead time is the usual constraint, and it is ordered before the start date rather than after it.
A kitchen we take on generally lands between $85,000 and $250,000 all in. Below that the scope is usually a refit rather than a renovation, and there are firms better suited to it than us.
A dropped bulkhead at the low end; a flush beam with new posts and a pad footing at the high end.
Semi-custom at the low end, full custom in solid timber with specialist hardware at the high end.
Higher wherever the existing service has to be replaced rather than extended.
Driven by material and by how many cuts and edges the layout demands.
Client-supplied or specified by us; either way it is a line in the budget, not an allowance to be discovered later.
Discovery
We open what we can and find out whether the wall is carrying.
Design
Layout, structure and every selection, priced as it develops.
Preconstruction
Estimate, permit, cabinetry ordered, schedule fixed.
Construction
Six to fourteen weeks on site, with a temporary kitchen.
Handover
Punch list closed before final payment, then warranty.
Almost everyone stays. We set up a temporary kitchen — usually in a dining room — with the refrigerator, a microwave, a kettle and a sink if there is one within reach. It goes in on day one, not week three.
The work area is sealed and run under negative pressure, and the route from the front door to the rest of the house stays clear and covered.
There will be two or three days with the water off and a week with no gas. Those are marked on the schedule in preconstruction so you can plan around them.
A walkthrough, an honest range, and a straight answer about whether that wall is carrying anything.