Today

Reimagined Construction

Design-build renovation

Abbasi BuildsStart a Project
Abbasi Builds

Have a house worth renovating?

  • 01Home
  • 02Work
  • 03Services
  • 04Process
  • 05About
  • 06Start a Project
  • Services

    • Whole-Home Remodeling
    • Kitchen Remodeling
    • Bathroom Remodeling
    • Home Additions
    • Design-Build
    • Architect-Led Construction
  • Work

    • Whole Homes
    • Kitchens
    • Bathrooms
    • Additions
    • Restorations
  • Company

    • Service Areas
    • FAQ
    • Warranty
    • Trade Partners
  • Legal

    • Privacy
Top
  • Twitter
  • GitHub
  • LinkedIn

© 2026 Abbasi Builds — All rights reserved

What we do

More house, without it looking like more house

  1. All services
  2. /Home Additions

An addition is judged on whether you can tell. The technical work is foundation, structure and weatherproofing; the thing that decides whether it was worth doing is proportion.

New structure meeting the original wall line

01

What's included

  • Feasibility against deed restrictions, setbacks and height limits.

  • Foundation assessment, and remediation or new foundation as required.

  • Structural design, framing and roof integration.

  • Extension of electrical, plumbing and mechanical to serve the new space.

  • Full finishing, and making good where new meets old.

  • Permitting and inspections throughout.

Fig. 01 — Footings and piers set to the surveyed lot lines
Fig. 02 — Roof tie-in where new work meets old
Fig. 03 — Cladding and trim matched to the existing elevation
02

What the work involves

Fig. 04 — Excavation, forms and the setback dimension on the ground

This is the part that decides whether an addition is straightforward or expensive, and it is settled before the design is worth developing.

A second storey puts load on a slab that was never designed for it. A rear addition puts a new foundation next to an old one, and the two will move differently unless the connection is detailed to allow it. Neither problem is exotic, but both are much cheaper to solve on paper than in the ground.

Fig. 05 — The junction of new roof to old, before flashing

Where the new roof meets the old is where additions leak, and it is the detail most worth spending money on. On a Gulf Coast house it also has to survive wind-driven rain from a direction the original roof never faced.

Matching the existing roof geometry rather than stacking a box on top is usually what makes the difference between an addition and an extension you can spot from the street.

Fig. 06 — Stamped drawings, plat and the approved permit set

Houston has no zoning, which surprises people into assuming there are no constraints. There are: deed restrictions, platting, setbacks, height limits and, in a historic district, design review.

We establish all of it in discovery. It is the cheapest phase in which to find out that the addition you have drawn is four feet too tall.

03

What drives the cost

How long it takes

Five to eleven months on site

Plus three to six months of design, permitting and preconstruction. Second storeys carry nine or more weeks of foundation work before anything appears above the roofline, which is the part clients find hardest.

Additions generally run $250 to $450 per square foot, with second storeys at the upper end because the foundation work comes before anything visible. A typical job we take on lands between $250,000 and $650,000.

Foundation work
$25,000 – $150,000

New foundation for a ground-level addition, or reinforcement and underpinning for a second storey.

Structure and framing
$60,000 – $220,000

Driven by span, by storey height, and by how much of the existing roof has to be rebuilt.

Roof integration
$18,000 – $80,000

Matching geometry costs more than abutting it, and is the difference between an addition and a bolt-on.

Services extension
$20,000 – $90,000

Often includes upgrading the existing service, because the original was sized for the original house.

Making good
$15,000 – $70,000

Where new meets old. Consistently underestimated, and the reason additions look added.

04

How it runs

  1. 01

    Discovery

    Feasibility, deed restrictions, and what the foundation can carry.

  2. 02

    Design

    Ten to eighteen weeks, with structural engineering from the start.

  3. 03

    Preconstruction

    Estimate, permits, and a schedule that assumes weather.

  4. 04

    Construction

    Five to eleven months, with the house open for part of it.

  5. 05

    Handover

    Punch list, warranty, and a return visit at one year.

05

Living through it

For a rear or side addition, staying is normal. The work is largely outside the existing envelope until the connection is made, and that connection is the only genuinely disruptive week.

For a second storey, staying is possible but unpleasant. The roof comes off. However well it is sequenced and dried in, you will live under temporary cover through at least one storm.

We phase second-storey work so the house is dried in as fast as the sequence allows rather than as efficiently as it allows, which costs a little and is worth it.

Fig. 07 — The existing house sealed off at the new opening
Fig. 08 — Working around the household — drive, access and deliveries
Fig. 09 — The wall coming out on the day the two halves join

Work like this

↔
Bellaire
Second-storey addition over an existing slab
↔
Houston Heights
1924 bungalow, taken back to the studs

The things people worry about

  1. 01How we protect the house
  2. 02Can we stay in the house?
  3. 03How change orders work
  4. 04The full process

Common questions

Adding on is usually cheaper than buying the same additional space in the same neighbourhood once transaction costs are counted — and in the inner Loop the gap is wide. It stops being true when the addition needs foundation work the house would need anyway, when the lot cannot take the footprint, or when what you actually want is a different street.

Structurally, most can, with work. The question is how much work, and that is a foundation question answered by assessment rather than by looking at the house. The answer is occasionally no — where the slab has moved badly enough that reinforcing it costs more than the addition is worth. We would rather establish that in discovery than after you have paid for a design.

No. Deed restrictions run with the property and are enforced by neighbours and civic associations rather than by the city, which makes them easy to overlook and expensive to breach. Setbacks, platting, height limits and historic district review all apply on top. We check all of it before design starts.

Tell us what you want to add

Additions start with feasibility — what the restrictions allow and what the foundation can carry. Both are answered before you pay for a design.

Start a Project