Today

Reimagined Construction

Design-build renovation

Abbasi BuildsStart a Project
Abbasi Builds

Have a house worth renovating?

  • 01Home
  • 02Work
  • 03Services
  • 04Process
  • 05About
  • 06Start a Project
  • Services

    • Whole-Home Remodeling
    • Kitchen Remodeling
    • Bathroom Remodeling
    • Home Additions
    • Design-Build
    • Architect-Led Construction
  • Work

    • Whole Homes
    • Kitchens
    • Bathrooms
    • Additions
    • Restorations
  • Company

    • Service Areas
    • FAQ
    • Warranty
    • Trade Partners
  • Legal

    • Privacy
Top
  • Twitter
  • GitHub
  • LinkedIn

© 2026 Abbasi Builds — All rights reserved

What we do

The whole house, taken apart and put back properly

  1. All services
  2. /Whole-Home Remodeling

A whole-home remodel is not a series of room projects run consecutively. It is one job with one structure, one set of services and one schedule — which is why it costs less than doing the same rooms one at a time, and why it is harder to live through.

A house stripped to studs, with the original frame visible

01

What's included

  • Design and full construction drawings for the entire house.

  • Structural work, foundation remediation and roof alterations where needed.

  • Complete replacement of electrical, plumbing and mechanical systems.

  • Every room fitted, finished and decorated.

  • Permitting, inspections and close-out documentation.

  • Full-house protection, or a coordinated move-out plan if staying is the wrong call.

Fig. 01 — Foundation remediation before anything is rebuilt on it
Fig. 02 — A full re-service — supply, waste, mechanical and electrical
Fig. 03 — Finishes carried through every room to one specification
02

What the work involves

Fig. 04 — Piers, beams and the level survey that decided them

Most Houston houses of any age have moved. On a whole-home job that stops being something to monitor and becomes something to fix, because every finish you are about to install will be hung off it.

We assess the foundation in discovery, get a geotechnical opinion where the movement warrants it, and carry the remediation as a named line rather than a hopeful contingency.

Fig. 05 — Panel, stacks and ducts, set out as one system

At this scope, replacing is almost always cheaper than extending. Pulling the whole electrical service, the whole supply and waste, and the whole mechanical system while the walls are open costs a fraction of doing it later, and it resets the clock on all three.

Slab plumbing is the exception worth naming: replacing under-slab drainage means breaking the slab, and that decision is made in preconstruction with a camera survey behind it, not on site.

Fig. 06 — The sequence board — what has to finish before what starts

The order is the job. Protection, demolition, structure, rough-in, inspection, close, finish, commission. Getting one out of order does not just cost time — it costs work already done.

03

What drives the cost

How long it takes

Seven to fourteen months on site

Plus four to seven months of design and preconstruction. Anyone quoting a whole-home remodel at four months is quoting a different job from the one you are describing.

Whole-home work we take on generally runs from $350,000 to well over $1,000,000. Per square foot, expect $200 to $450 depending on how much of the structure and the services move.

Foundation remediation
$18,000 – $120,000

Levelling and pier work at the low end; underpinning and slab replacement at the high end.

Systems replacement
$70,000 – $220,000

Electrical service, supply and waste, and mechanical across the whole footprint.

Structural alteration
$25,000 – $180,000

Opening the plan, new beams, roof changes, and anything a previous renovation cut through.

Kitchen and bathrooms
$120,000 – $400,000

Typically a third to a half of a whole-home budget. The rest of the house is cheaper per square foot than these rooms.

Finishes throughout
$90,000 – $350,000

Flooring, joinery, decoration and hardware across every room, driven almost entirely by specification.

04

How it runs

  1. 01

    Discovery

    Existing conditions, foundation, services, and what the city will require.

  2. 02

    Design

    Twelve to twenty weeks. Every room, every selection, priced as it develops.

  3. 03

    Preconstruction

    Line-item estimate, permits, long-lead orders, fixed contract sum.

  4. 04

    Construction

    Seven to fourteen months, with a published weekly schedule.

  5. 05

    Handover

    Punch list, close-out records, warranty, and a return visit at one year.

05

Living through it

For a true whole-home remodel, staying is usually the wrong call, and we will tell you so even though moving out is the easier job for us.

The house will have no functioning kitchen for months, the services will be off for extended periods, and the dust containment that works for one room does not work when every room is open at once.

Where clients do stay, it is normally a phased version — the house split into two zones and the work run through them in sequence. That adds two to four months and roughly ten per cent, and we price it as its own option so you can compare it against the rent it saves.

Fig. 07 — The last room used before the household moves out
Fig. 08 — Site protection at the front door and the stair
Fig. 09 — Handover walkthrough with the punch list open

Work like this

↔
Houston Heights
1924 bungalow, taken back to the studs
↔
Bellaire
Second-storey addition over an existing slab

The things people worry about

  1. 01Can we stay in the house?
  2. 02How we protect the house
  3. 03What happens when something is wrong behind a wall
  4. 04The full process

Common questions

When the structure, the foundation and the services all need replacing and the layout does not survive anyway, you are paying a premium to keep a shell that is not doing much for you. The honest counterweights are the things a rebuild cannot buy back: the setbacks and footprint an older house is grandfathered into, mature trees, the character of an original street elevation, and in a historic district, permission. We will run that comparison with you in discovery. It occasionally ends with us advising against the job.

You can, and it costs more overall — typically fifteen to twenty-five per cent — because mobilisation, protection and management happen more than once. It also constrains the design: a phase boundary has to fall somewhere structurally sensible, which is not always where the budget wants it. Where it does make sense is when the alternative is deferring the work entirely, or when the second phase depends on something you genuinely cannot decide yet.

If it is still moving, yes — or you will be repairing finishes you have just paid for. If it has moved and stopped, sometimes not. That distinction needs measurement over time rather than a single opinion, which is why we start looking at it in discovery rather than at contract.

Tell us about the house

Whole-home work starts with a walkthrough and a conversation about what the structure and the services actually need, before anyone talks about finishes.