Reimagined Construction
Design-build renovation
West University
A load-bearing wall removed and carried on a flush beam, so the ceiling reads as one plane instead of announcing where the wall used to be.
Property
Single-family house
Age
Built 1948, extended 1996
On site
Four months
Size
480 sq ft of works
A galley kitchen closed off from the family room by a wall the owners had been told, twice, was not structural. It was. It carried the ceiling joists for the whole rear half of the house, and a previous renovation had already cut two joists through it to run a duct.
The 1996 extension had left the kitchen with an exterior wall that was no longer exterior, still insulated and still carrying its original cladding behind the plasterboard.
One connected space across the back of the house.
Keep the ceiling flat — the owners had seen too many jobs where a dropped bulkhead marks the old wall line forever.
Do it in one summer, with the family staying in the house.
A flush beam was the only way to keep the ceiling continuous, and a flush beam has to be carried down to something. That meant new posts inside existing walls and a new pad footing at one end, which is a much larger job than the cosmetic one the owners had budgeted for.
We priced both options and showed them the dropped-bulkhead version honestly, because it was less than half the cost. They chose the flush beam knowing exactly what it bought.
Two joists had already been cut. They had to be sistered and re-supported before anything else could be touched, which moved a week of work to the front of the schedule.
The family stayed throughout. A temporary kitchen went into the dining room on day one, and the work area was sealed under negative pressure for the full four months.
Flush beam set and posts carried down
A flush LVL beam concealed in the ceiling depth, carried on new posts inside the flanking walls and a new pad footing at the exterior end.
The redundant exterior wall was opened, cleared and rebuilt as an interior partition, which recovered four inches of floor width across the whole run.
Ceiling plane continuous end to end — nothing in the finished room says where the wall was.
West University
Flush LVL beam
Quarter-sawn oak cabinetry
Honed stone worktops